SharePoint custom installation: services deployed by Qim info
Mobilised for a 20-day assignment, the Qim info consultant deploys an approach with a four-stage structure:
1- Targeted audit and diagnosis
A technical and functional inventory is carried out to analyse the bottlenecks, the existing configuration and the specific expectations of internal departments. This phase enables a clear plan and detailed architecture to be drawn up for restructuring the SharePoint 2019 portals.
2- Design of an optimised SharePoint environment
Based on the diagnosis, Qim info defines a new document hierarchy, refines access levels and improves the user interface. The portals are redesigned to adapt to the company’s actual workflows, with an emphasis on scalability and security.
3- Technical deployment and incident resolution
The new version of SharePoint is deployed in accordance with Microsoft best practice. Technical problems are corrected, the necessary functionalities are added, and the entire environment is stabilised, to reinforce its reliability.
The infrastructure is then configured so as to guarantee a high level of security, sustainable scalability and optimal performance. Certain functionalities have been enhanced by the integration of technologies such as Nintex, a solution specialising in the automation of business processes and the orchestration of workflows, which is perfectly compatible with SharePoint. In particular, it simplifies repetitive internal procedures and reduces the operational workload of teams.
To find out more, read our article dedicated to the topic: Nintex Workflow for SharePoint: optimising your business processes.
4- Change management support
The Qim info team supports the company with change management, facilitating the transition to the new portal and meeting the challenges associated with organisation and user adoption.